English

Road Works to Commence on St. James Road as Part of the Concrete Hard Resurfacing Project

Whatsapp Image 2025 10 29 At 12.26.27 Pm

The Ministry of Public Housing, Spatial Planning, Environment and Infrastructure (VROMI), Department of New Works, would like to inform the public, particularly the residents of St. James Road, Middle Region that road works will commence as part of the ongoing Concrete Hard Resurfacing Project.

Works are scheduled to begin on Monday, October 27th, 2025, and are expected to continue for approximately three (3) weeks, pending weather conditions and unforeseen circumstances. These works are part of the Ministry’s continued efforts to improve road infrastructure, enhance drainage, and provide safer, more durable roadways for all motorists and pedestrians.

To facilitate the smooth execution of this project, St. James Road will be closed daily from 7:00 a.m. to 4:00 p.m. during the construction period. Residents and motorists are advised to make the necessary arrangements to avoid delays and to follow the traffic control signs and directions provided by on-site personnel.

A temporary bypass will be created at the beginning of Mount Repose Drive, allowing access and continuation onto the main road, Middle Region Road. This bypass is designed to ensure residents and emergency vehicles can still enter and exit the area safely while works are underway.

As part of the construction timeline, concrete pouring will be executed in sections. This method ensures that each section is properly cured and completed before moving on to the next, maintaining the quality and longevity of the road surface.

The Ministry of VROMI appreciates the patience and cooperation of all residents and motorists during this period. Your understanding is vital as we continue to upgrade and strengthen the island’s road network for the benefit of the community.

Key Information Recap:
• Project: Concrete Hard Surfacing Project, St. James Road, Middle Region
• Start Date: Monday, October 27th, 2025
• Duration: Approximately 3 weeks
• Road Closure: 7:00 a.m. – 4:00 p.m. daily
• Bypass: Accessible via Mount Repose Drive, connecting to the main road
• Advisory: Expect traffic delays; obey signage and on-site personnel

Press release: Government of Sint- Maarten

Related posts

Aruba Airport Hosts Press Visit in Anticipation of the Opening of the New U.S. Check-In Terminal

EA News Author

Interinsular Games 2027: Aruba, Bonaire, and Curaçao prepare for a new edition of sports competition and friendship

EA News Author

Son of victims asks for justice to prevail in his Parents’ Case

EA News Author

Leave a Comment

Whatsapp Message